Well, nothing like hitting the ground running, my first job at SSW was to join the TFS Migration Team, it was a fun experience, let me tell you how it went.
Update #1 20th January 2010: Have a look at our Rules to better TFS2010 Migration
Adam put a few guys together:
- Adam Cogan (Australia) – The team lead who checks everything and makes us follow the rules to better TFS .
- Eric Phan (Australia) – Created an excellent “Rules to a successful migration from TFS 2008 to TFS 2010 guide”
- Justin King (Australia) – Justin seems to play the part of devil’s advocate. I looked him up in the company directory and he is a previous employee…I guess you never really leave SSW.
- Me (Scotland) – The implementer
- Allan Zhou (Beijing) – My co-conspirator for the implementation
We started at 2:30am (GMT+1) on Saturday morning and we did it in 5 major steps:
- Backed up TFS 2008 databases (Some 14GB of data)
- Restored databases to new 64 bit server
- Installed TFS 2010 Beta 2 64 bit
- Run the Upgrade of 2008 data to 2010 Beta 2
- Tested the deployment
We completed the migration at 9:15am (GMT+1) on Saturday morning so all in the migration took just less than 7 hours.
[![]()
](http://blog.hinshelwood.com/files/2011/05/GWB-WindowsLiveWriter-SSWGoLivewithVisualStudio2010Beta2_15047-image_2.png )Figure: Web Access – Working
[![]()
](http://blog.hinshelwood.com/files/2011/05/GWB-WindowsLiveWriter-SSWGoLivewithVisualStudio2010Beta2_15047-VS2010_2.png )Figure: Visual Studio - Working
Well done to the SSW team.
Well done also to the guys involved in the TFS team, the same migration from TFS 2005 to TFS 2008 was a much more painful experience taking days of work, but the guys from SSW made this process easy and straight forward…Preparation does that for a project…
A possible claim to fame: In addition we might have been the first company (SSW is a company of 52 employees and contractors) to migrate. So far I have not seen any blog posts about other companies migrating everything over to Beta 2. I am a TFS MVP and no-one on that list has posted about a migration yet (I can just imagine Justin King having another fit when he finds that out).
Smart Classifications
Each classification [Concepts, Categories, & Tags] was assigned using AI-powered semantic analysis and scored across relevance, depth, and alignment. Final decisions? Still human. Always traceable. Hover to see how it applies.
What to read next
Upgrading Team Foundation Server 2008 to 2010
Step-by-step guide to upgrading Team Foundation Server 2008 to 2010, covering database backup, migration, verification, compatibility, and …
Upgrading from TFS 2010 Beta 2 to TFS 2010 RC done
Step-by-step guide to upgrading from TFS 2010 Beta 2 to TFS 2010 RC, including best practices, troubleshooting tips, and post-upgrade checks …
Upgrade to Visual Studio 11 Team Foundation Service - Done
Explains migrating source control and work item tracking to Visual Studio 11 Team Foundation Service, highlighting cloud benefits, …
Upgrading from TFS 2008 to TFS 2010 Overview
Guides the upgrade from TFS 2008 to TFS 2010, covering technical steps, process template migration, challenges, and best practices for a …
In-Place upgrade of TFS 2008 to TFS 2010 with move to new domain
Step-by-step guide to upgrading Team Foundation Server 2008 to 2010, including in-place upgrade, build server update, and migrating to a new …
Detecting agile theatre with real delivery signals
Why Most Companies Operating Models Fail in Dynamic Markets
A concise comparison of Predictive and Adaptive Operating Models, explaining why traditional structures fail in dynamic markets and how …
Don’t Manage Dependencies, Remove Them
Explains why dependencies are a sign of poor system design and outlines steps to eliminate them by aligning teams, clarifying ownership, and …
The Estimation Trap: How Tracking Accuracy Undermines Trust, Flow, and Value in Software Delivery
Tracking estimation accuracy in software delivery leads to mistrust, fear, and distorted behaviours. Focus on customer value, flow, and …
Flow of Value vs Flow of Work – Misnomer or Useful Shorthand?
Compares “flow of value” and “flow of work” in Kanban, explaining why only validated outcomes count as value and stressing the need for …
Why Outsourcing DevOps Fails, and How Real Engineering Excellence Starts With Your Team
Avoid DevOps vendor lock-in, discover how true engineering excellence starts with partnership, not outsourcing. Ready to transform your …