Upgrading from TFS 2008 to TFS 2010 Overview

TL;DR

Guides the upgrade from TFS 2008 to TFS 2010, covering technical steps, process template migration, challenges, and best practices for a smooth transition.

31 July 2012
Written by Martin Hinshelwood
4 minute read
Subscribe

I have not thought about an upgrade from TFS 2008 to TFS 2010 is quite a while as most if not all of my customers have already made the move to 2010. However one of my colleagues asked if I had done one recently and well… not in a while.

There are really two main parts to any upgrade. The physical upgrade of one version of the product to another. And then the configuration within that product to make everything sing and dance.

The hard part if the singing and dancing so lets tackle the upgrade first.

#1 Upgrading from TFS 2008 to TFS 2010 / TFS 2012

Although Brian Harry has an awesome post on this I wanted to pull together the experiences that I have had over the years into one place that I can reference.

Upgrading from 2005 to 2008 was a very painful experience. So much so that the team at Microsoft spent a lot of time and money on making the experience as slick and easy as possible. TFS 2010 upgrades are a dream and with TFS 2012 I have been speechless at the  smoothness of the upgrade experience.

#2 Migrating Process Template

Doing something with the Team Projects that you now have in the new version of the product are another matter and a much more complicated one. There are a number of ways to handle this and if you are moving to TFS 2010 then they are all manual:

My best documentation of my experience of implementing #7 was as part of a 2010 to 2012 upgrade, but the process is the same.

In TFS 2012 after the upgrade there is an option on a per-Team Project bases to perform and automatic enablement of the new 2012 features. While this is awesome it does not change the process template hat you are using and instead injects only the bits requires to get the new features working. And it is not available for TFS 2010!

Conclusion

A TFS 2008 to TFS 2010 upgrade takes no more than a day at the most, but the real hard work is in getting the Process Template to where it is useable for the customer. Take the time here to make and understand the choices.

How did you get on upgrading TFS 2005/2008 to TFS 2010/2012?

Smart Classifications

Each classification [Concepts, Categories, & Tags] was assigned using AI-powered semantic analysis and scored across relevance, depth, and alignment. Final decisions? Still human. Always traceable. Hover to see how it applies.

Subscribe

What to read next

Article

Upgrading Team Foundation Server 2008 to 2010

Step-by-step guide to upgrading Team Foundation Server 2008 to 2010, covering database backup, migration, verification, compatibility, and …

Read article
Article Engineering Excellence

Visual Studio 2012 RTM available & installed

Covers installing and upgrading to Visual Studio 2012 RTM and Team Foundation Server, key new features, upgrade tips, common issues, and …

Read article
Article Engineering Excellence

In-Place upgrade of TFS 2008 to TFS 2010 with move to new domain

Step-by-step guide to upgrading Team Foundation Server 2008 to 2010, including in-place upgrade, build server update, and migrating to a new …

Read article
Article

Upgrading your Process Template in Team Foundation Server

Explains methods for upgrading process templates in Team Foundation Server, comparing pros and cons of each approach, and highlighting …

Read article
Article Scrum

Process Template Upgrade #3 - Destroy all Work Items and Import new ones

Step-by-step guide to upgrading a process template in TFS by deleting all existing work items, archiving queries and reports, and importing …

Read article